SQUARE BALER TWINE

 

 

 

Minimum Foot
per Bale

Knot Strength (lbs)

Tensile Strength (lbs)

Spools
per Bale

Bales
per Skid

Packaging Specifications
per Unit = Total Runnage

7,200

190

-

1

72

2 SPOOLS 7,200’ = 14,400

7,000

210

-

1

72

2 SPOOLS 7,200’ = 14,000’

9,000

130

-

2

80

2 SPOOLS 4,500’ = 9,000’

9,000

150

-

2

80

2 SPOOLS 4,500’ = 9,000’

7,200

180

-

2

80

2 SPOOLS 3,600’ = 7,200’

9,600

180

-

2

80

2 SPOOLS 4,800’ = 9,600’

12,000

180

-

2

80

2 SPOOLS 6,000’ = 12,000’

 

WIRE REPLACEMENT BALER TWINE

 

Minimum Foot
per Bale

Knot Strength (lbs)

Tensile Strength (lbs)

Spools
per Bale

Bales
per Skid

Packaging Specifications
per Unit = Total Runnage

7,700

240

-

1

72

2 SPOOLS 7,000’ = 15,400’

7,200

260

-

1

112

2 SPOOLS 4,850’ = 14,400

7,000

280

-

1

112

2 SPOOLS 7,000’ = 14,000’

 

BIG SQUARE BALER TWINE

 

Minimum Foot
per Bale

Knot Strength (lbs)

Tensile Strength (lbs)

Spools
per Bale

Bales
per Skid

Application

4,000

350

-

1

72

2 SPOOLS 4,000’ = 8,000’

4,000

400

-

1

72

2 SPOOLS 4,000’ = 8,000’

4,000

450

-

1

72

2 SPOOLS 4,000’ = 8,000’

4,000

500

-

1

72

2 SPOOLS 4,000’ = 8,000’

 

HIGH DENSITY BALER TWINE

 

Minimum Foot
per Bale

Knot Strength (lbs)

Tensile Strength (lbs)

Spools
per Bale

Bales
per Skid

Application

4,000

550

-

1

72

2 SPOOLS 4,000’ = 8,000’

4,000

650

- 1 72

2 SPOOLS 4,000’ = 8,000’

 

BIG ROUND BALER TWINE

 

Minimum Foot
per Bale

Knot Strength (lbs)

Tensile Strength (lbs)

Spools
per Bale

Bales
per Skid

Packaging Specifications
per Unit = Total Runnage

20,000

-

110

1

160

2 SPOOLS 20,000’ = 40,000

20,000

-

130

2

80

2 SPOOLS 10,000’ = 20,000

28,000

-

110

2

80

2 SPOOLS 14,000’ = 28,000

28,000

-

130

2

80

2 SPOOLS 14,000’ = 28,000’

40,000

-

110

2

80

2 SPOOLS 20,000’ = 40,000’

 

ADDITIONAL RUNNAGES AVAILABLE UPON REQUEST